CAL POLY
Cal Poly Pomona Annual Improvement Contracts
​
Scope of Work:
​
Horizons engaged in a yearly contract to deliver construction services to Cal Poly Pomona University, renowned as a leading engineering institution in Southern California. The university's projects encompassed various scopes and presented diverse challenges. Despite these variations, Horizons effectively executed all projects required by the university's various departments. Subsequently, the Cal Poly Pomona community opted to extend Horizons' contract multiple times, a testament to Horizons' ability to meet and exceed the client's expectations consistently.
Cost: $3,500,000.00
​
Duration: 1 Year Contract
​
Completed: 2020
​
Square Footage: Varies
CITRUS COLLEGE
Owner: Citrus Community
College District
Cost: $2,274,270.00
Duration: 290 Calendar Days
1000 W Foothill Boulevard
Glendora, CA 91741
Completed: 2017
Square Footage: 5,620SF
Citrus Community College Hayden Hall
Scope of Work:
Project work consists of a complete demo of the interior building of Hayden
Hall, to perform renovations and seismic upgrades of the existing historic-
cal building at Citrus College. Interior Work consisted of demoing existing
interior finishes, electrical, HVAC System, and plumbing, and installing
new Finishes and MEPs. Furnishing new conference area with conference
table and projection screens. The exterior work was to construct a brand new
building entrance with steps, guardrails, landscape and irrigation, doors
and windows, and re-plaster and paint the entire building, in addition
to brand newroofing, metal trimming, and sheet metal.
DAVIDSON SCHOOL
Cost: $820,0000
Duration: 140 Calendar Days
Completed: 2021
Square Footage: 9,000 SF
Owner: San Bernardino City
Unified School Distric
2844 N Davidson Ave.
San Bernardino, CA 92405
Single Point of Entry Davidson Elementary School
SCOPE OF WORK:
Project Consists of complete renovation and upgrades to the Single Point
of Entry for Davidson Elementary School for San Bernardino Unified
School District. The project has a challenging schedule to complete all the
improvement requirements before kids return to school. Horizons was
able to meet the deadlines and provide quality finished products, on time
before the deadline.
CLAREMONT SCHOOL
Claremont Unified School
Cost: $11,037,000.00
Duration: 360 Calendar Days
1601 N. Indian Hill Blvd.
Claremont, CA 91711
Completed: 2021
Square Footage: 36,061 SF
Claremont High School New Student Center Building
SCOPE OF WORK:
Construction of a New 2-Story Student Center Facility at Claremont High School
The building includes a Kitchen Area, Multi-Purpose Room and a total of six smart classrooms
Work for this project for the following trades, Demo, Grading, Site Utility,
Plumbing, Structure Steel, Glazing, Mechanical and Electrical / Low Voltage.
Interior Work would include wood ceilings, gypsum board installation,
painting and Classroom Accessories.