CAL POLY

 Cal Poly Pomona Annual Improvement Contracts
​
   Scope of Work:

​

Horizons engaged in a yearly contract to deliver construction services to Cal Poly Pomona University, renowned as a leading engineering institution in Southern California. The university's projects encompassed various scopes and presented diverse challenges. Despite these variations, Horizons effectively executed all projects required by the university's various departments. Subsequently, the Cal Poly Pomona community opted to extend Horizons' contract multiple times, a testament to Horizons' ability to meet and exceed the client's expectations consistently.

Cost: $3,500,000.00

​

Duration: 1 Year Contract

​

Completed: 2020

​

Square Footage: Varies

CITRUS COLLEGE

Owner: Citrus Community

College District

Cost: $2,274,270.00

Duration: 290 Calendar Days

1000 W Foothill Boulevard
Glendora, CA 91741

Completed: 2017

Square Footage: 5,620SF

Citrus Community College Hayden Hall

Scope of Work:

Project work consists of a complete demo of the interior building of Hayden

Hall, to perform renovations and seismic upgrades of the existing historic-

cal building at Citrus College. Interior Work consisted of demoing existing

interior finishes, electrical, HVAC System, and plumbing, and installing

new Finishes and MEPs. Furnishing new conference area with conference

table and projection screens. The exterior work was to construct a brand new

building entrance with steps, guardrails, landscape and irrigation, doors

and windows, and re-plaster and paint the entire building, in addition

to brand newroofing, metal trimming, and sheet metal.

DAVIDSON SCHOOL

Cost: $820,0000

Duration: 140 Calendar Days

Completed: 2021


Square Footage: 9,000 SF

 

Owner: San Bernardino City

Unified School Distric

2844 N Davidson Ave.
San Bernardino, CA 92405

Single Point of Entry Davidson Elementary School

SCOPE OF WORK:

Project Consists of complete renovation and upgrades to the Single Point

of Entry for Davidson Elementary School for San Bernardino Unified

School District. The project has a challenging schedule to complete all the

improvement requirements before kids return to school. Horizons was

able to meet the deadlines and provide quality finished products, on time

before the deadline. 

CLAREMONT SCHOOL

Claremont Unified School

Cost: $11,037,000.00

Duration: 360 Calendar Days

1601 N. Indian Hill Blvd.

Claremont, CA 91711

Completed: 2021

Square Footage: 36,061 SF

Claremont High School New Student Center Building

SCOPE OF WORK:

 

Construction of a New 2-Story Student Center Facility at Claremont High School

The building includes a Kitchen Area, Multi-Purpose Room and a total of six smart classrooms

Work for this project for the following trades, Demo, Grading, Site Utility,

Plumbing, Structure Steel, Glazing, Mechanical and Electrical / Low Voltage.

Interior Work would include wood ceilings, gypsum board installation,

painting and Classroom Accessories.